Rigging services – Due to crane issues, KMX was approached by a good client with a 24hr response time to mobilize and load a +120,000 lb unit. The scope included moving the 80′ x 15′ x 13′ lwh unit from storage area to the facility’s loading bay. KMX was able to coordinate operations, and the unit was loaded in less than 24 hrs of the initial contact.