KMX crews recently supported a local customer with a scheduled armature switch out. The 120,000 lb backup armature (stored at KMX’s facility) was rigged out and transported for the planned outage. KMX crews are now in the process of constructing a new shipping frame to transport the “old” armature to a repair facility.